
Line for the processing of hog’s heads
A complete continuous line for the processing of hog’s heads consists of several sections.
Cleaning
Cleaning table with lift loader
The hog’s heads are pre-cleaned manually and placed onto the singeing belt.
Singeing
Singeing plant with transport belt
Via a transport conveyor, the hog’s heads are continuously conveyed through the gas-heated singeing unit in which all bristles are removed.
Cleaning
Drum-type washing system
The pre-cleaned and singed hog’s heads are washed in the drum-type washing system.
Curing / Reddening
Cure injector / storage room / reddening system
After the injection of the curing brine, the hog’s heads are continuously reddened or stored for curing and then transferred to the cooking plant.
Cooking / stewing
Drum-type cooking system
The whole or halves of hog’s heads are continuously cooked in a drum-type cooking system.
Cooling / Rinsing
Fresh water cooling system
For cooling and rinsing, the cooked hog’s heads are transferred to a continuous cooling basin with fresh water rinsing.
De-Boning
De-boning tables with de-boning belt
The de-boning of the cooked and pre-cooled hog’s heads and the sorting of the individual kinds of meat are done manually.
Phone +49 (2520) 9307-0 | Fax +49 (2520) 9307-50 | www.berief.de | info@berief.de






